The recent news in the Guardian that over 100 data centres in the UK are turning to gas to generate electricity has raised interesting questions around power supply, emissions targets and, of course, the requirement for more, faster data centres.

Data centre demand – whether that’s for new sites or upgraded existing facilities – is being driven by the growth of AI and cloud services. Appetite for AI in every industry and a range of applications also means it’s not just more data centre installations that are needed but bigger, more powerful ones.

At the same time, the UK power grid is under strain and creating major development bottlenecks for hyperscalers. The fact that data centre operators are considering on-site gas generation only highlights the problem.

But it’s not just about electricity bottlenecks. The growth of AI and meeting consumer demand widens the issue; it’s also about infrastructure and design of data centres, as much as power availability. Can the surrounding infrastructure keep as data centres scale?

Legacy infrastructure is no match for AI demand

AI workloads are increasing the pressure on infrastructure – it needs more processing power, higher rack densities and greater cooling capacity. All these things increase energy consumption across a site.

This shift is placing pressure not just on data centres themselves, but on the wider infrastructure that supports them. Existing grid connections, substations, backup power systems and cooling networks are being pushed harder as operators look to accommodate growing power-hungry environments.

Suddenly data centres lauded for future-readiness, aren’t actually able to cope with what’s being demanded of them. And sites with legacy infrastructure built to support enterprise workloads are falling behind, facing capacity limitations all round. Add sustainability expectations to the mix and it’s the perfect storm.

All of this creates demand for electrical upgrades, cooling retrofits, phased modernisation programmes and more detailed operational resilience planning.

The art of the retrofit

In a perfect world, legacy data centres could be rebuilt from scratch. However, from a practicality, urgency and budget perspective it’s more likely that incremental upgrades will be the solution to cope with the demand from AI. Phased upgrades – drawing on specialist electrical installation services to modernise distribution systems, improve cooling solutions and upgrade power infrastructure – will boost performance while the site keeps running.

The shift is not purely about speed. Retrofit can also support wider sustainability and operational goals by extending asset life and reducing the embodied carbon associated with demolition and new construction. In an industry under growing pressure to balance performance with environmental responsibility, incremental upgrades can offer a more commercially and environmentally viable path forward.

However, retrofitting high-demand digital infrastructure is rarely straightforward. Upgrades need to be carefully sequenced to minimise operational disruption while ensuring facilities can continue to scale alongside rising power and processing requirements. As a result, integrated engineering and infrastructure planning are becoming more important in helping operators future-proof assets for this new environment.

Energy as part of design

As power constraints intensify, energy considerations are becoming central to data centre design and infrastructure planning. Power is no longer an operational or utilities issue, but is now influencing decisions around layout, resilience, scalability and long-term performance from the earliest stages of development.

Operators are exploring a wider mix of solutions to improve flexibility and reduce pressure on existing infrastructure. Alongside more traditional backup systems, this includes on-site generation, battery storage and dedicated electrical services for facilities managing fluctuating demand more efficiently. Cooling design is also coming under greater scrutiny, particularly as higher-density AI workloads generate significantly more heat than conventional computing environments.

At the same time, there is growing interest in how excess heat from data centres could be reused more effectively, particularly within wider industrial or district energy networks.

Conclusion

The operators who will come out ahead are those treating power and infrastructure not as a constraint to work around, but as a core design variable.

That means bringing energy planning into conversations earlier – at the feasibility and briefing stage, not once a capacity problem has already appeared. It means stress-testing existing assets against realistic AI workload projections, not theoretical future demand. And it means being honest about which parts of a site are genuinely upgradeable and which represent a longer-term liability.

Retrofit will be the reality for most operators in the near term, but not all retrofits are equal. The difference between an upgrade programme that buys five years of headroom and one that simply keeps the lights on today comes down to the quality of planning behind it. Integrated engineering – where electrical, cooling, structural and operational considerations are developed together – is what separates a reactive fix from a genuine step-change in capability.

The pressure on data centres isn't easing. But for operators willing to think strategically about their infrastructure now, that pressure is also an opportunity to build facilities that are genuinely ready for what comes next.