Case Study
Uncovering Harmonic Inefficiencies in Data Centre Cooling for Global Client

Department
Electrical
Project Value
£50,000
Scope of works
- Investigate excessive power consumption in cooling systems for a global data centre provider.
- Carry out harmonic surveys on chiller supplies at multiple European sites.
- Coordinate safe shutdowns with local operations teams for controlled testing.
- Install, relocate and remove power analysers across four countries.
- Analyse and consolidate measurement data into clear recommendations for remedial works.
About
A global data centre provider was seeing higher-than-expected power consumption in its cooling systems across a number of its European locations. This impacted operating costs and efficiency targets.
The client asked Berkeley Installations’ R&D team to investigate whether electrical harmonics on the chiller supply were contributing to these inefficiencies.
Why harmonics matter in data centre cooling
In modern data centres, chillers, pumps and fans are typically driven by variable speed drives. These provide excellent control and efficiency, but they also introduce electrical harmonics into the supply. When harmonic levels rise, they can cause a host of issues, including a higher current draw, extra heat in motors and drives, reduced power factor, and instability and performance drift.
Across a portfolio of data centres, these effects compound into significant extra energy use for cooling, even when cooling demand itself has not increased.
Challenges
The investigation required both technical depth and tight coordination across multiple live sites:
- Multi-country logistics: Site surveys and harmonic measurements had to be carried out across Germany, Poland, Switzerland and Italy, each with different local procedures and access requirements.
- Maintaining uptime during testing: The R&D team needed to liaise with on-site engineers to safely shut down and restart chillers for controlled testing windows, without affecting IT availability or breaching operational constraints.
- Deploying specialist test equipment: Power analysers had to be installed on chiller supplies, left in place to capture data over time, then removed, packaged and shipped on to the next location in sequence.
- Data consistency and comparability: Measurements from different countries, power systems and chiller configurations had to be gathered in a consistent format so that findings could be compared and consolidated into a single, coherent set of conclusions.
Solutions
Our R&D team put in place a structured, repeatable test programme:
- Planned site access and shutdowns: Coordinated with the client’s operations teams in each country to agree on access, testing windows, and safety procedures.
- Deployment of power analysers: Installed portable power quality analysers on chiller feeds to record voltage and current waveforms, total harmonic distortion and power factor over representative operating periods.
- Centralised analysis and reporting: Collected all measurement files into a central analysis environment, enabling the team to identify common patterns, quantify the impact of harmonics on power consumption, and separate site-specific anomalies from systemic issues.
- Actionable recommendations: Produced clear, site-by-site reports confirming that harmonics on the chiller supplies were a material source of inefficiency and setting out practical mitigation steps, including the installation of appropriately sized harmonic filters.
During works
Throughout the programme, our engineers worked closely with local teams to:
- Agree shutdown and restart sequences that aligned with each site’s risk appetite and maintenance windows.
- Communicate progress and findings to the client.
- Capture on-the-ground observations about chiller operation, loading patterns and control settings to support data interpretation.
This collaborative approach ensured measurements were taken under realistic conditions and that any recommended changes would be both technically sound and operationally acceptable.
Completion
The investigation confirmed that elevated harmonic levels on chiller circuits were contributing to excessive power consumption in the client’s cooling systems.
By installing correctly sized harmonic filters and optimising the electrical setup around the chillers, the client was able to take corrective measures, including:
- Reduce power draw for their cooling plant.
- Optimise cooling system performance.
- Safeguard operational reliability across their European data centres estate.
Berkeley Installations delivered the project within the agreed budget and programme, providing the client with a clear evidence base for targeted remedial works and a pathway to more efficient, predictable cooling performance across multiple countries.