Case Study

Rack Installation for Data & Report Management Company

Image
 

Department

Power/Electrical

Project Value

£175,000

Scope of works

  • Install a new busbar system over all rack locations.
  • Install, level, earth, and bay customer racks.
  • Install the roof and door system, giving a sealed cold aisle containment.
  • Install a new floor to ceiling cage, including the installation of a biometric door system.

About

The world’s most heavily regulated organizations have trusted Berkeley Installations with their data centres since the 1980s.

We had to install a new POD of racks within their new data hall for their latest customer. The specifications of the POD included new racks, cold aisle containment, an overhead busbar system and an external security cage to sub divide the DC.

Challenges

The main challenge during this project was working within a live data hall whilst maintaining the high standard of cleanliness for existing customers.

Solutions

A Starline busbar system was to be used as it allowed additional future tap-offs to be installed without the isolation of the busbar.

During works

The commencement of the 2020 pandemic meant we had to reassess these works along with our practices on site. This meant bringing in COVID-19 risk assessments, additional hygiene and PPE, socially distancing workers, staggering breaks and ensuring no mixing of teams to eliminate the possibility of cross contamination.

Completion

The project was delivered on time, within customer time frames and without the need for any extras or additions to the initial quote. All testing was carried out on-site before handover, with test results supplied to the customer contact in the US via email, and copies stored by Berkeley Installations for 5 years from the date of completion. A QA of the environment was completed by the customer’s on-site contact (DCS team leader), the Berkeley PM and the Berkeley site supervisor.

Enquiries

To enquire about our services, please complete the form below

Powered by ChronoForms - ChronoEngine.com

  • Harrods
  • Harrods
  • Harrods
  • Harrods
  • ISO 45001 Health & Safety Management
  • Harrods
  • Harrods
  • Harrods