Menu

CASE STUDIES

Past projects completed by Berkeley Installations

Rack Installation for Iron Mountain

Since 1951, Iron Mountain has been the trusted guardian for more than 225,000 customers including 95% of the Fortune 1000. The world’s most heavily regulated organizations have trusted us with their data centres since the 1980’s.

Iron Mountain required us to install a new POD of racks within their new data hall for their latest customer. The specifications of the POD included new racks, cold aisle containment, overhead busbar system and an external security cage to sub divide the DC.

 
 

Project Detail:

  • Installation Date – February 2020
  • Department – Power/Electrical
  • Manufacturers Used – Starline & Prism
  • Project Value - £175,000
  • Rack Scope - Minkels

Scope of Works:

 
  • Installing a new busbar system over all rack locations
  • Installation, levelling, earthing and baying of customer racks
  • Installing the roof and Door system giving a sealed cold aisle containment
  • Installing a new floor to ceiling cage including the installation of a biometric door system
 

Challenges

 

The main challenge during this project was working within a live data hall whilst maintaining the high standard of cleanliness for existing customers.

 

Solutions

 

Starline busbar system was to be used as it allows additional future tap-offs to be installed without the isolation of the busbar.

 

During Works

 

The commencement of the 2020 pandemic meant we had to reassess these works along with our practices on site. This meant bringing in COVID-19 risk assessments, additional hygiene and PPE, socially distancing workers, staggering breaks and ensuring no mixing of teams to eliminate the possibility of cross contamination.

Completion

 

The project was delivered on time, within customer time frames and without the need for any extras or additions to the initial quote. All testing was carried out on site before handover with test results supplied to the customer contact in the US via email with copies stored by Berkeley Installations for 5 years from the date of completion. A QA of the environment was completed by the customers on site contact (DCS team leader), the Berkeley PM and the Berkeley site supervisor.

 

To find out more about our this case study, or to see out how we can meet your requirements please contact us.

 

CONTACT US